Collapsible Rolling Cart Pink
$74.99
SKU:
Pink Collapsible Rolling Cart with an integrated lid and four 360-degree swivel wheels for smooth, stable movement. Impact-resistant, reinforced construction supports daily transport, and the cart folds flat with the lid nested inside for compact storage.
Inner: 14 L x 12 D x 12.5 H / Outer: 15.25 L x 14.25 D x 18 H
